What to sort out before you fly home
A short trip, planned around family, and the first week disappears into the property. This page is a six-week run-up so the problems are found and quoted before the plane, not discovered on arrival with everyone standing around.
Last checked:
The trip is short, and the house will take it all
The pattern repeats every December. Three weeks are booked, nearly all of them meant for family: a wedding, an anniversary, children meeting cousins they have only seen on a screen. Then the first week goes to the property instead. A gate that doesn’t close. A tenant who left in August. A build two courses of blocks short of what the last photo suggested.
What makes that expensive is the timing, not the problem. Found on arrival, it has to be settled in a few days, while jet-lagged, while relatives who all have an opinion are in the room, and with every price got in a hurry. Those are the property decisions people later regret, and they sour a visit meant to be about family.
Found six weeks earlier, the same problem is a different thing: time to ask questions, time to get two prices, time to let the first reaction pass. The plane then lands on a plan instead of a surprise.
Six weeks before: see it as it is now
Start with one set of photos of the property as it stands today. Not a description of it, and not a summary from somebody who has already decided what should happen next. Photographs with the date and time on each, from fixed points: the gate, both front corners, each face of the building, and each room if the place is empty and reachable. Meter readings for electricity and water where a meter can be read. Then a plain list of what was there on the day.
Two things make that set useful. First, the fixed points: the same angle from the same spot is what lets this December be compared with next June, while a close-up of a wall tells you nothing a month later. Second, whoever takes the photos should have no stake in what you decide. A caretaker reporting on the compound he runs, or a fundi on work he is paid for, is not dishonest for giving an account shaped by his own position. It is simply not a baseline.
Six weeks out is practical as well: if something needs pricing, there is time to get two prices.
Four weeks before: get quotes, not opinions
A number said on a phone call is not a quote. Ask for it in writing, with four things in it: the person’s full name, their phone number, what is included, and what is not. “Repair the roof, 85,000” is a figure. “Replace 14 iron sheets on the rear slope, including ridge cap, labour and transport; gutters not included; 85,000” is a quote you can compare, and later check against what was delivered.
Get two where you can, even if the second comes from a town over. Two prices for the same written scope tell you more about the first price than any amount of discussion. A large gap usually means the two are describing different jobs.
Then split the work in two, in writing. One list to be finished before you arrive: clearing, a leaking tap, a door that won’t lock. The other waits until you are there, because it needs your decision: tiles, a boundary wall, whether to let the house at all.
Be wary of “it can be sorted when you come.” It is rarely meant badly, but said often enough it quietly moves every decision into your holiday. Each time you hear it, ask what stops it being settled now.
Two weeks before: the boring admin
None of this is interesting, and all of it is faster from a desk than from a plastic chair in a county office with three days left.
- Land rates and county charges. What is owed, and whether anything is in arrears. Arrears do not announce themselves until you need a clearance for something else.
- Electricity and water accounts. The balance on each, and whether a meter has been disconnected. That is a different cost, with a waiting time, from an unpaid bill.
- A caretaker’s or helper’s pay, up to date. A trip that opens with a money conversation at the gate sets the tone for everything after it.
- Keys, and who actually holds them. Not who is supposed to. How many sets exist, who has each, and whether a lock has been changed.
- If the place is let: when rent was last received, how much, and into whose account. Ask for the last three months as figures and dates, not as a reassurance.
Is the property a house being built in Nairobi or Kiambu? I can go on a Saturday and send what you were told set beside what I saw, with the date and time on every photo, as one PDF within 48 hours.
Chat on WhatsAppThe week before: tell people you are coming, and when
Vagueness about dates creates a scramble. “Sometime in December” means nothing is prepared until a phone call from the airport. Send the day you land, the day you leave, and the date and time you intend to be at the property.
Say what you want to do there and how long you have for it. “Saturday the 20th, nine until one at the plot, and I want to see the boundary stones, the water connection and the two quotes for the wall” is a brief someone can get ready for. “I’ll come and see the plot” is not.
If work is ongoing, ask for the site to be tidied, offcuts and rubble cleared, and every delivery note, receipt and bank slip gathered in one place. Paperwork spread across three phones, half of it in a chat you have been removed from, eats a whole day of the trip.
Travelling in the short rains
The short rains run roughly from October into December, so a December arrival often meets soft ground. This matters most for plots. An access road that is a twenty-minute drive in dry weather is a different proposition after a night of rain, and a murram track that looked fine in September may not take a saloon car. Ask someone who has driven it that week, not someone remembering last year.
Rain also shows what dry weather hides: where water collects and sits, which way the ground actually drains as opposed to how the plan says it should, where a roof lets water in, where a wall is damp at its base, whether the neighbour’s runoff crosses your boundary.
So ask for some photographs taken during the rain, not only afterwards on a bright morning. A wet photo of a corner where water pools is worth more than a dry one two days later, when the stain is all that is left.
While you are there
Four habits turn a visit into something still useful in March.
- Take the same wide photos from the same spots. Gate, left front corner, right front corner, phone held sideways, standing where the earlier photos were taken, so the next set lines up with this one.
- Record the meters twice: the day you arrive and the day you leave, with the date visible in the photo. Two readings a fortnight apart show what is actually being used.
- Photograph documents rather than taking originals away. Title documents, rates receipts, delivery notes, the tenancy agreement: every page flat, in good light, originals left where they are kept.
- Agree the next three months in writing before you fly back. Who does what, by when, and what it costs. One message to everyone involved, while you are all in the same country.
Before you fly back
Set the routine that will carry on without you, while you are still there, because it is easier to agree in person than over a bad line six weeks later. Three questions settle it: who sends what, how often, and on which day. One set of wide photos a month from the same three spots is usually enough for a finished house; a build needs them weekly.
Add the code-word habit before you leave. You choose an ordinary word each week and send it only to the person you are asking; they say it out loud, with the date and time, at the start of the video. An old clip cannot contain a word you only chose that week, so anything sent later is clearly recent. It is set out in full in the code-word method.
Where Truhali fits
Truhali is one person: me, Jose, in Nairobi. Right now I take one kind of visit: a construction check, before you send the next building payment. On a Saturday I go to the site in Nairobi or Kiambu and send photos with the date and time on each one, an arrival and a departure video in which I say the code word you sent that morning, what you were told set beside what I saw, and the visible materials counted, as one PDF within 48 hours. It is USD 75 (about KES 9,700). The first ten owners pay USD 65 (about KES 8,400): USD 35 when they book, and USD 30 after they’ve seen the report. Visits to plots and finished houses are not offered right now.
I never collect rent, hold keys, find tenants, value land, settle boundaries or handle building money. Visits are in Nairobi and Kiambu on Saturdays, and the sample report shows what the PDF looks like.
Visual observation only: not a valuation, survey or certificate.
Related
If the property is a build, see 12 signs your build in Kenya isn’t where they say it is.
Questions about the trip home
How far ahead should I start preparing?
About six weeks. The first thing is a record of how the place actually looks now, because every quote, every argument and every decision on the trip refers back to it. Four weeks out you are collecting written quotes, two weeks out the boring paperwork, and the last week is telling people you are coming.
Should I tell people exactly when I am arriving?
Yes. Send the day you land, the day you leave, and when you will be at the property, about a week ahead. That is enough time for anything that needs sorting to get sorted, which is usually the point. Arriving unannounced tends to cost you more in the relationship than it gains you in what you see.
Arrive knowing what you'll find.
Message on WhatsApp with the town and the stage you were told the build has reached. I reply personally, usually within a few hours (Kenya time).
You pay part when you book, and the rest only after you’ve seen your report. Message, voice note, email or a call: whichever suits you.