Truhali Jionee mwenyewe WhatsApp

One Saturday at a build, in photos

On Saturday 7 November 2026 I walked round a friend’s bungalow being built in Kajiado County, south of Nairobi, and photographed it the way I photograph a check: outside, the roof, every room, water and power. My friend said yes to sharing it. Faces and number plates are blurred, and the location data is removed from every photo. It was not a paid check, and nothing here is a judgement on the builder.

Getting there

A footpath across burnt grassland, with a small roof far away on the horizon
The last stretch is on foot, across open land. The house is the roof in the distance.
The same footpath nearer, with a grey-roofed bungalow ahead
Nearer. I photograph the approach too, so you see the site from outside before I go in.

Outside

The front: dressed-stone walls, the roof on, and a porch on columns
The front: dressed-stone walls, the roof on, and a porch on columns.
Closer: the porch and front gable are plastered and the windows have glass in
Closer: the porch and front gable are plastered and the windows have glass in.
One side: pointed stone, with the base of the wall plastered
One side: pointed stone, with the base of the wall plastered.
The other side, with a second porch and the iron-sheet chicken coop
The other side, with a second porch and the iron-sheet chicken coop.
The iron-sheet chicken coop. The pit beside it, on the right, is for the biodigester, which isn't installed yet
The iron-sheet chicken coop. The pit beside it, on the right, is for the biodigester, which isn't installed yet.
From the corner. The rubble from the build is heaped away from the walls
From the corner. The rubble from the build is heaped away from the walls.
Under the roof overhang: the underside isn't boarded yet
Under the roof overhang: the underside isn't boarded yet.
The windows were just glazed: every pane is in and well secured. The white marks are from the fresh glazing work
The windows were just glazed: every pane is in and well secured. The white marks are from the fresh glazing work.

Materials on site

Cut stones stacked on site for the work still to do
Cut stones stacked on site for the work still to do.
A heap of kokoto (ballast)
A heap of kokoto (ballast).
Waste rock left over from the build, heaped away from the house after the clean-up
Waste rock left over from the build, heaped away from the house after the clean-up.

The roof, before the ceiling hides it

Timber trusses under the sheets. Once the ceiling goes up, nobody sees these again
Timber trusses under the sheets. Once the ceiling goes up, nobody sees these again.
Conduit pipes for the wiring run over the tops of the walls, ready for the ceiling
Conduit pipes for the wiring run over the tops of the walls, ready for the ceiling.

Inside

The main room: walls plastered, switch and socket boxes in. The ceiling team was at work
The main room: walls plastered, switch and socket boxes in. The ceiling team was at work.
Gypsum ceiling boards going up, with the joints being filled
Gypsum ceiling boards going up, with the joints being filled.
Another room with its ceiling boards fixed
Another room with its ceiling boards fixed.
Wires out of the boxes, waiting for switches and sockets
Wires out of the boxes, waiting for switches and sockets.
A serving hatch between two rooms. No ceiling in that one yet
A serving hatch between two rooms. No ceiling in that one yet.
A corner window with grilles
A corner window with grilles.
The distribution board, cover off, with the cables not yet connected
The distribution board, cover off, with the cables not yet connected.
The main door: steel, fitted
The main door: steel, fitted.

Water and power

The water meter isn't secured yet: it sits loose on stones. It should end up locked in a box. The water works are still in progress
The water meter isn't secured yet: it sits loose on stones. It should end up locked in a box. The water works are still in progress.
From the meter, the supply pipe runs on the surface to the house, not buried yet
From the meter, the supply pipe runs on the surface to the house, not buried yet.
The water tank, standing straight on the ground
The water tank, standing straight on the ground.
The electricity meter box on the outside wall. No meter is connected yet: power hasn't reached the property
The electricity meter box on the outside wall. No meter is connected yet: power hasn't reached the property.
Waste pipe ends through the base of the wall, not connected yet
Waste pipe ends through the base of the wall, not connected yet.
A water pipe lying on the surface beside the wall
A water pipe lying on the surface beside the wall.

What you get from a check

Every photo in full size, the times they were taken, and a plain report like this one. Saturday construction checks are in Nairobi and Kiambu: see where I visit and how a construction check works.