A real Truhali report, page by page

This is the full 22-page report from Truhali’s first visit, on Saturday 3 October 2026, to a two-level house still being built in Machakos County, just outside Nairobi. It is shared with the owner’s permission, with the code word and anything that could identify the place removed. You pay part when you book, and the rest only after you’ve seen your own report.

VISIT REPORT SATURDAY 3 OCT · 12:10 15 OK 1 Attention 1 Not access. 1 Not present
A drawing of the report’s cover: the date and time of arrival, and how many points were fine, need attention, couldn’t be reached or aren’t there yet.

A second sample (SAMPLE-002), from Saturday 7 November 2026: a friend’s bungalow in Kajiado County, with the roof on and the ceilings going up. It is shown with my friend’s permission. It was not a paid check, Kajiado is outside the area I visit, and no code-word video was recorded that day. See it in the photo album, or open that report (PDF, 1.8 MB).

Page 1: the visit at a glance

The cover answers the first question an owner abroad asks: what did you find? It gives the date, the times of arrival and departure, and one line in plain words: “At a glance: mostly OK, one thing worth a look, one point I couldn’t reach.” Under it are the counts: 15 points OK, 1 needing attention, 1 not accessible and 1 not present yet.

It also lists the two code-word videos, the arrival video at 12:10 and the departure video at 12:35, and says that every photo was taken within 47 metres of the others. The exact location is kept private and is never printed.

Page 1 of the sample report: the cover with the house photo, the date, the status counts and the code-word video times
Page 1: the cover.
Page 2 of the sample report: the summary in plain words and the table of what was seen at each point
Page 2: the summary in plain words.

Page 2: what was seen, in plain words

The summary describes the property as it was that Saturday: a two-level house still under construction, with walls, roof slab, windows and staircase in place, the inside walls plastered and the floors still rough. It then lists what needs attention in a short table, with the photo numbers, and names the points that were OK in one line. Below that, a build-stage line shows how far the house has got, and a minute-by-minute line shows the code word said on video on arrival and on leaving, with every photo taken in between. There are no guesses about cause or cost, and no judgement about anyone.

Pages 3 and 4: what you were told, and what I saw

This is the page a construction check is built around. Before the visit, the owner tells me what they have been told about the site: the stage it has reached, what has been delivered, what was promised by now. On the day I photograph those same things, and each one gets a plain answer with the photo number beside it: matches what you were told, different from what you were told, could not be seen on the day, or needs somebody qualified.

The owner of this house didn’t book a construction check, so the five claims on this page are examples, written to show how it works and marked as examples in the report. The answers are real: each one is what the photos from that Saturday show.

Straight after comes Your options from here, taken only from those answers: ask before any money moves, get somebody qualified to look, or book another visit. It never says whether to pay. That decision stays yours.

Page 3 of the sample report: five things the owner was told, each with an answer such as Different from what you were told or Matches what you were told, and the photo numbers
Page 3: five things the owner was told, each answered from the photos.

Pages 5 to 15: the 12 fixed points outside

Every visit photographs the same 12 points, in the same order, so the next visit can be compared with this one: the gate from the street, the outer wall all the way round, the house front, both sides and the back, the roof line, the compound, the water tank, the electricity and water meters, and the drainage. Each photo has its number and the time it was taken, with one plain line underneath.

Page 8 of the sample report: two photos of the house front from the fixed point, each with its number and time
Page 8: the house front, from the same spot every visit.
Page 15 of the sample report: the electricity meter photos side by side, the water meter marked Not accessible, and three drain photos with the problem ringed
Page 15: the meters, and the drain with the problem ringed.

Every photo, in full resolution

The report shows the clearest one or two photos per point, each across the full width of the page, with what else a visit can do at that point. Every photo from the visit comes with it in full resolution, as a zip file or on WhatsApp, whichever you prefer, so you can study the whole visit.

What the four statuses mean

  • OK: seen, and nothing worth flagging.
  • Attention: worth a look. Here, the drain channel along the wall was full of rubble, timber and a cement bag, with its cover hidden under boards.
  • Not accessible: couldn’t be reached, and the report says why. Here, the water meter was behind a small gate or under sheets and timber.
  • Not present: not there yet. Here, the electricity meter wasn’t installed; the wall box held switches only.

Pages 16 to 22: inside, how it was recorded, every photo

This owner also asked for the rooms inside, so the report adds the living space, passage, staircase, the kitchen before its fittings, a bathroom and the master bedroom. A contact sheet then shows every photo on one page. The last pages explain how the visit was recorded and list every photo with its number, file name, time and distance from the first photo.

What was removed before sharing

The owner’s name and reference, the code word, the exact location and the coordinates are not in this copy, and the area is shown only as the county. No faces, car number plates, house or plot numbers or street signs appear in the photos. Your own report keeps your code word in the videos, and only you receive it.

Getting a report like this for your property

Visits are in Nairobi and Kiambu on Saturdays. A construction check is USD 75 (about KES 9,700). The first ten owners pay USD 65 (about KES 8,400): USD 35 when they book, and the rest after they’ve seen the report. Right now I’m only taking construction checks.

Visual observation only: not a valuation, survey or certificate.

Want one for your own property?

Message on WhatsApp with the town and the stage you were told the build has reached. I reply personally, usually within a few hours (Kenya time).

You pay part when you book, and the rest only after you’ve seen your report.